Remote Learning Postponed
Posted Date: 09/08/26 (09:01 AM)
The high school building was planning to have an electrical shutdown September 14th and 15th. This was for the ongoing building project. The shutdown has been postponed to a later date. Necessary switch gear that was shipped, was not the correct switch gear for the PCS job. When we get a set date from the construction company we will make an announcement to students and parents. During this two day shutdown grades 7-12 will be going to remote learning. Thank you for your patience and cooperation!
