Skip to main content

Remote Learning Postponed

Posted Date: 09/08/26 (09:01 AM)


The high school building was planning to have an electrical shutdown September 14th and 15th.  This was for the ongoing building project.  The shutdown has been postponed to a later date.  Necessary switch gear that was shipped, was not the correct switch gear for the PCS job.  When we get a set date from the construction company we will make an announcement to students and parents.  During this two day shutdown grades 7-12 will be going to remote learning.  Thank you for your patience and cooperation!